A useful conversation before the summer rush
If your agency manages rentals, now is a good time to look beyond the next inspection and ask what each property may need before its next agreement. Victoria’s new rental energy efficiency standards begin in phases from 1 March 2027. They are adopted changes with future commencement dates, rather than a proposal awaiting a decision.
That doesn’t mean every appliance must be replaced on 1 March. The starting dates, existing equipment and agreement triggers matter. Getting those details into your planning now gives rental providers a clearer budget conversation and your team fewer surprises when a campaign is ready to launch.
Separate the dates from the triggers
The standards cover heating, cooling, hot water, shower heads, ceiling insulation and draughtproofing. From 1 March 2027, the new heating and hot-water replacement requirements generally apply when an existing system fails beyond repair. A functioning system isn’t automatically due for replacement simply because that date arrives; existing minimum standards still apply.
Other requirements are linked to new agreements or conversion to periodic agreements. Draughtproofing has a later start, from 1 July 2027. Exemptions can apply, so check the standard relevant to the property rather than treating a general checklist as a compliance decision.
For your office, separate ‘action needed now’, ‘action at an agreement trigger’ and ‘replacement when equipment fails’. That simple distinction makes an owner update much more useful than a blanket warning about expensive upgrades.
Start with rentals that have no fixed cooling
For a property without fixed cooling, Consumer Affairs Victoria’s guidance identifies a new agreement or conversion to a month-to-month agreement from 1 March 2027 as the trigger to install a qualifying fixed cooler in the main living area, subject to applicable exemptions. The published timetable also brings all rental properties into the cooling requirement from 1 July 2030, regardless of agreement timing.
Properties with existing cooling need a separate check against the guidance for that system. Don’t assume a unit’s appearance tells you its efficiency rating. Ask for its model details and have the installer confirm the relevant specification and climate rating.
A practical example: if an uncooled property’s fixed term ends in April, put the agreement transition and cooling review in the diary now. Confirm the required work before making promises about the next tenancy.
Check insulation without guessing from the photographs
From 1 March 2027, the ceiling-insulation requirement is triggered by a new agreement or conversion to a periodic agreement. It targets ceiling spaces, or parts of them, with no insulation, with a minimum R5.0 installation requirement and applicable exemptions. Existing insulation does not automatically need topping up to R5.0 under this standard.
CAV requires a certified installer and an electrical safety check within the required 30-day window before installation, with identified electrical issues fixed first. Leave the ceiling-space assessment to the appropriate professionals; a property manager or photographer shouldn’t be making that technical call.
Your useful contribution is coordination: establish what evidence exists, arrange an assessment where needed, and record who is confirming the scope. A ceiling that looks immaculate in a listing photograph tells you nothing about the insulation above it.
Get the quote before promising a discount
The Victorian Energy Upgrades program now offers ceiling-insulation discounts for eligible uninsulated and under-insulated homes. Eligibility for a discount and the rental minimum-standard obligation are different questions: a property may qualify for an upgrade incentive without being required to top up existing insulation.
Ask an accredited provider to confirm eligibility and provide the installed price with the discount included. The program says the discount must be applied before work starts. Avoid putting an assumed rebate amount into an owner’s budget and sorting out eligibility afterwards.
Turn the review into a workable campaign plan

Our suggested workflow is one short record per property: agreement dates, current equipment, supporting documents, the question still to resolve, and the person responsible for the next step. Give each follow-up a date. An owner’s approval to obtain a quote is different from approval to proceed with the work, so keep those decisions clear.
For sales teams, the same preparation helps with investor enquiries. If a purchaser asks what upgrades a tenanted property will need, provide the verified information available and refer unresolved compliance questions appropriately. Avoid describing a property as fully compliant simply because it has air conditioning.
Scandipik’s iGUIDE floor plans can help your team explain the layout and identify the main living area in conversations with owners and trades. Photography can show completed visible improvements once the work is finished. Neither replaces an installer’s assessment or proves energy compliance.
Before refreshing a rental campaign, confirm that its images and description reflect what has actually been completed. Keep proposed works clearly separate. A little planning now makes the next owner conversation, trade booking and listing update easier to manage.
Disclaimer: This article provides general information only and does not constitute legal, financial, property or other professional advice. While we aim to keep information accurate, we do not guarantee its accuracy, completeness or currency. Laws and market conditions may change. You should independently verify information and seek advice from a suitably qualified professional before acting on it.